- Fund raising for the equipment of 6 villages with wells et 8 villages using surface water (Senegal river or Guiers lake) : agreement of French Cooperation and of Aquassistance.
- Writing of a file on the main results (going on, see first results on interdev-net.org).
- First studies for 3 pumping and treatment stations for villages using surface water (see report)
- Participation to the 3rd world water forum
- Completion or consolidation of the existing installations (see reports)
- Nord-Pas-de-Calais Council is agreed to support a 6 months program for the completion and the consolidation of Alizes 1 (beginning : december 2002).
- We are looking after new funds : the equipments are stopped. Ousmane Hann, project manager of Alizes, is still in contact with villagers and local companies.
- The Alizes team will stay at St Louis still 31/03/2002 in order to finalize all the actions. A last SSM windpump and a PV pump will be installed. 34 villages will be equiped (32 wells and 2 using water river).
- The project evaluation will be done in december, with an senegalese independant consultant, Focus. The report will be downloaded on this site.
- The Alizés project final report has been transmitted to European Commission (main funder). You can download it (in french !) : format Word 97, format pdf
- Statement of the installations : equipment of 32 villages with 28 windpumps (9 Oasis/EIC, 13 SSM, 6 Fiasa) and 4 PV pumps ; 2 villages used the water of Senegal river. It is less than previous but each installation is more powerful (see explanations in Final report).
- 17 windpumps are installed on wells :
12 windpumps EIC (diameter 3m or 3.30 m )
4 windpumps SSM (diameter 6 m)
1 windpump Fiasa ("argentine" windpump which has been repaired).- Works of installation : 8 Fiasa et 3 SSM.
- Civil works done on 29 sites.
- 2 stations of pumping and treatment of Senegal river water : they give a good water to the 2 villages.
- July 2000 : decision of install 3 types of windpumps, EIC330, Fiasa et SSM.
- June 2000 : checking of the 10 first installations to improve the works of EIC and the results.